Pre-Construction Anti-Termite Treatment (IS 6313 Part 2)
The most effective time to protect a building from subterranean termites is during foundation excavation. We treat the bottom and sides of foundation trenches, the backfill earth adjacent to masonry, and the sub-floor soil prior to laying the PCC concrete bed with non-repellent, long-residual termiticides (Chlorpyrifos / Imidacloprid) that create a continuous, lethal chemical perimeter under the entire plinth.
